GProgress

Construction progress

Where every building stands this month, storey by storey, with the latest milestone from site.

L02Updates

Act Heights

72% built

Under construction

Uttara Sector 3. Approval RAJUK/DC/UTT-2024/782-M. Handover: December 2026.

View the building
  1. September 2026

    Superstructure 7th Floor Slab Casting Completed

    Concrete crushing test certified at 4,500 PSI. Internal brick masonry underway on 3rd & 4th levels.

    72%
  2. April 2026

    Basement & Substructure Waterproofing Completed

    Reinforced concrete foundation finished with 100% moisture membrane sealing.

    45%
L03Quality

How we check the work

Our engineers test materials before they go in, not after. Ask for the reports for any building.

Soil first

Every plot gets a sub-soil investigation before the foundation is designed.

Concrete, batch by batch

Cylinders from each pour are crush-tested. Nothing below the specified strength stays in the frame.

Steel, tested

Reinforcing bars are tension-tested against their grade before they are fixed.

Reports you keep

Test results are shared with buyers and landowners as the building goes up.